Monday 19 August 2013

Wall finishes

The walls and insulation are done.  Plastering and painting is finished around the production studio and radio studios, and inside all the studios the wall fabrics are up and looking splendid in red and black.  The new ceiling and tiles are also up and ready for the new lighting to be fitted.
 
Red and black wall fabrics
Production and Radio Studio outer walls
Radio Studio outer walls, window and door

No comments:

Post a Comment