The studio is transforming very fast now and the new ceiling and floor are well on the way. Pallets loaded with Rockwool have arrived for the soundproofing of the studios and frames are being assembled for them to be put up in front of the walls. The old radiators have been removed as they would have been in the way.
New floor in studio |
New lower ceiling frame |
A pallet of rockwool |
No comments:
Post a Comment