Work is continuing at a pace and Rockwool is still arriving by the pallet for the walls in the production and radio studios. Rockwool is even going under the new floor they are putting in.
![]() |
| A layer of board added to the main studio walls |
![]() |
| Rockwool under the new floor boards |
![]() |
| Rockwool in the new wall space |
![]() |
| Plasterboard covers the Rockwool inside the walls |




No comments:
Post a Comment